Jean’s Place.  

Construction of New Affordable apartment housing for Seniors, comprising of approximately 107,000 GSF, 104 units, Ten stories tall with partial finished Basement, Urban Farm of approximately 11,000 GSF on the 1st floor and Green House of approximately 8,000 GSF on the roof floor. The project will provide for on-premises Senior Center and large contingent of common areas recreational space for the residents. The building will be designed to meet NYSERDA and Green Communities environmental criteria. The building structure will comprise Cast-In-Place Concrete Floors and Columns, Masonry bearing walls, combination brick and rains screen facades, two access elevators and enhanced a high level interior finishes etc. Gardens, terraces and extensive outdoor spaces.

Location
485-515 Van Sinderen Avenue, Brooklyn, New York

Owner/Developer:


Projected Cost:

Start Date:

Community Counseling & Mediation
25 Elm Street, Brooklyn, New York 11201
Emory Brooks (CEO)
TBD

TBD


PROJECTS IN PROGRESS

Queens Animal Care Center. Start: June. 2019 - Jan. 2022

The work consists of performing, installing, furnishing and supplying all materials, equipment, labor and incidentals necessary or convenient for the complete new construction of 1906 Flushing Avenue, Ridgewood, NY. This new three-story building will provide approximately 50,000 SF for an Animal Shelter operated by the Animal Care Center of New York. The facility will provide animal adoption and surrender services, animal housing, a public animal medical clinic, animal shelter medical care and all support services for the facility. The building is to be constructed of masonry bearing walls and concrete plank floor construction and will be provided with two service grade elevators that will provide access to all floors. The site will provide parking at two locations providing 26 cars on grade at Flushing Avenue and 24 cars and a garage for two service vehicles at Troutman Street. New sidewalks, paving and landscaping, including exterior covered dog runs will be provided as well.

Location
1906 Flushing Avenue, Ridgewood, New York 11385

Owner/Developer:


Projected Cost:

1906 Flushing LLC
11 Park Place, Suite 805, New York NY 10007
Jennifer Piibe – 212-676-8558
$29,479,247

Beverly's Place. Start: Dec. 2017 - Sep. 2019

Construction of New Supportive Affordable apartment housing, comprising of approximately 64.265 GSF, 72 units, Six stories tall plus full finished basement. The project will provide for on-premises supportive services and large contingent of common areas recreational space for the residents. The building is designed to meet NYSERDA and Green Communities environmental criteria. The building structure comprises of Pre-cast Hollow Core Concrete planks Floors, Masonry bearing walls, combination brick and rains screen facades, two access elevators and enhanced a high level interior finishes etc. Intensive Green Roof, terraces and extensive outdoor spaces.

Location
402-422 Snediker Avenue, Brooklyn, New York

Owner/Developer:


Projected Cost:

Beverly’s Place L.P & Beverly’s Place HDFC
25 Elm Street, Brooklyn, New York 11201
Emory Brooks (CEO) – 718-935-9147 / 718-802-0666
$21,284,884


PARTIAL LIST OF COMPLETED PROJECTS

 

JERICHO Walton Avenue Apartments 

Start: June 2016 – May. 2018
Construction of New affordable housing comprising of approximately 53,000 GSF, 90 units of Single Room Occupancy (SRO), ten stories high plus full finished basement. The project is a joint venture partnership between B & B Supportive housing and Jericho Project. The project will provide for on-premises supportive services and large contingent of common areas recreational space for the residents. The building is designed to meet NYSERDA and Green Communities environmental criteria. The building structure comprises of Pre-cast Hollow Core Concrete planks Floors, Masonry bearing walls and interior drywall partitions etc. Roof terraces and extensive outdoor spaces.
Location
2065 Walton Avenue, Bronx, New York

Owner/Developer:



Projected Cost:

Jericho 2065 Walton Ave. Housing Dev. Fund Corporation
& 2065 Walton Avenue Associates, LLC
245 West 29th Street, Suite 902, New York, New York 10001
Tori Lyon - (646-624-2341)
$23,192,733


SERVIAM Heights

Start: Jan. 2016 – May 2018
Serviam Heights

Construction of New affordable housing apartments comprising of 140 units of One bedroom apartments and renovation of another existing building comprising of 57 units One bedroom apartments. The entire project consisting of the two major buildings will be 197 apartments and 183,000 GSF. The project is funded via Low Income Housing Tax Credit, NYC HPD and US Housing and Urban Development (HUD). The building structure comprises of Pre-cast Hollow Core Concrete planks Floors, Masonry bearing wall and interior drywall partitions etc. Interior Community spaces, roof terraces and extensive outdoor playground areas and parking amenities.

Location
2848 Bainbridge Avenue, Bronx, New York

Owner/Developer:

 

Projected Cost:

Fordham-Bedford Housing Development Corporation
2751 Grand Concourse, Bronx, New York 10468
Jack Coogan @ OCV Architects (212-675-6470)
$56,436,000

The Glenmore

Start: Oct. 2015 – Dec. 2017

Affordable Housing for Women-in-Need, specifically targeted for low income families. The project is funded via Low Income Housing Tax Credit, NYC HPD and New York State Homeless Housing Assistance Program (HHAP). The building 176,000 Gross Square Feet and there will be combined total 161 one bedroom and Studio apartments with Social Services office and other support spaces. The building structure comprises of Pre-cast Hollow Core Concrete planks Floors, Masonry bearing wall and interior drywall partitions etc. Outdoor playground areas and parking site amenities.

Location

91 Junius Street, Brooklyn, New York

Owner/Developer:


Projected Cost:

WIN GLENMORE HDFC & GLENMORE HOUSING ASSOC.
115 West 31st Street, New York, New York 10001
Jerry Mascuch - (212-560-0225)
$52,863,000


265 Van Brunt St. Brooklyn 

Start: Feb. 2015 – September 2016
New construction of 20,000 gross square feet and 4 stories high mix-use development. The building will consist of one and two bedrooms residential and commercial spaces at the ground level, plus full basement support spaces. There will be 27 apartments at completion. The building structure comprises of Pre-cast Hollow Core Concrete planks Floors, Masonry bearing wall and facades, passenger elevators and interior drywall partitions etc
Location
265 Van Brunt Street, Brooklyn, New York.

Owner/Developer:


Projected Cost:

Cheever Development Corporation
60 Sackett Street, Brooklyn, New York 11231
Mr. Matthew Lonuzzi (718) 834-0770
$3,800,000

Corretta Scott-King Apartments

 Start: July, 2013 – Aug. 2015
HUD and HPD funded 202 Housing Program, New construction of 45,000 sq. ft., 4 stories Elderly Housing. There will be 51 one bedroom apartments with Social Services and other support spaces. The building structure comprises of Pre-cast Hollow Core Concrete planks Floors, Masonry bearing wall and interior drywall partitions etc.
Location
Corner of McClancy Place & Jerome Avenue, Brooklyn New York

Owner/Developer:

Projected Cost:

Community Partners Commission & Association, Inc.
3227 Mickle Avenue, Brooklyn New York 10469
Dedra Wade, President (718-652-5358
$11,658,000

Gateway Elton Street Building Phase-2

Start Feb. 2013-Aug. 2015

New construction of three (3) buildings within the same Cluster of approximately 209, 000 gross square feet. The project consists of 175 residential units, 6 Retail Spaces, ancillary spaces and full roofs Solar Panel Super structures. The buildings are Five and Six stories high, and the main super structure consist of precast concrete plank floors, composite masonry bearing walls and facades, wood piles cast in place concrete grade beams foundation structure.

Location
516, 524 Vandalia Ave., 526 Schroeders Ave., Brooklyn, New York

Owner/Developer:


Projected Cost:

Elton Owner 1 LLC / Hudson Companies, Inc.
826 Broadway New York, New York
Mr. Aaron Koffman (212-777-9500)
$42,000,000 +/-

Millennium Limited Partnership

Start: Jan. 2013- April. 2013
 

Interior Renovation and Tenant Fit-Out of 6,000 square feet demised space within an existing multi-tenant office building, consisting of new trading cubicles, A/C ductwork extensions, electrical, telecommunication, data control, center for a major NYSE trading Company. Cheever Development Corporation is the Owner’s representative / CM overseeing all activities of the General Contractor (RELATED) and team of Architects and Engineers.

Location
1700 East Putnam Avenue, old Greenwich, Connecticut

Owner/Developer:


Cost:

Integrated Holdings / MLP
666 Fifth Avenue, New York, NY
Mr. James Sheridan (212-708-4789)
$1,800,000

Millennium Limited Partnership Start: Jan. 2013- April. 2013

Interior Renovation and Tenant Fit-Out of 5,000 square feet demised space within an existing multi-tenant office building, consisting of new trading cubicles, A/C ductwork extensions, electrical, telecommunication, data control, center for a major NYSE trading Company. Cheever Development Corporation is the Owner’s representative / CM overseeing all activities of the General Contractor (RELATED) and team of Architects and Engineers.

Location
666 Fifth Avenue, New York, New York

Owner/Developer:


Cost:

Integrated Holdings / MLP
666 Fifth Avenue, New York, NY
Mr. James Sheridan (212-708-4789)
$1,950,000

Gateway-Elton Street Building Phase-1

Start 12/2011 – 11/20/201
New construction of four (4) buildings within the same Cluster of approximately 215, 000 gross square feet. The project consists of 197 residential units, 7 Retail Spaces, One full Daycare Center and ancillary spaces and full roofs Solar Panel / Super structures. The buildings are Five and Six stories high, and the main super structure consist of precast concrete plank floors, composite masonry bearing walls and facades, wood piles and cast in place concrete grade beams foundation structure
Location
1149, 1152, 1165, 1166 Elton Street Brooklyn, New York

Owner/Developer:


Cost:

Elton Owner 1 LLC / Hudson Companies, Inc.
826 Broadway New York, New York
Mr. Aaron Koffman (212-777-9500)
$46,000,000 +/-

Council Tower V Senior Housing

Start 12/2009-8/2011
New Construction of 70,000 square feet, 11 stories precast Hollow Core Concrete Planks Floors, comprised of 71 apartments with Community spaces, social services offices and library. The project is funded by U.S. Housing and Urban Development, under the 202 Elderly Housing Program.
Location
789 Co-Op City Blvd, Bronx, New York

Owner/Developer:

Cost:

Metropolitan Council on Jewish Poverty
80 Maiden Lane
New York, NY 10012
Mr. Gary Gutterman (212-453-9559)
$16,190,000

NHP Abba Homes, LLC

Start 9/2010-8/2011

Gut rehabilitation of ten (10) building in various sites comprised of twenty four residential dwelling units. Project was a takeover from prior contractor who was defaulted by the Owner and HPD, and funded by the U.S Housing and Urban Development and NYC Housing Preservation and Development.

Location
Various sites - Brooklyn, NY
Owner/Developer:


Projected Cost:

ABBA HOMES, LLC
1158 Intervale Avenue, Bronx, NY 10459
Mr. Richard Ortiz (347) 664-4843
$1,750,000

Harrison Circle Morris Height Medical Center

Start 1/2008 - 11/2010

Owner Representative of a New Construction of Residential, Commercial and Community Health Center located in the Bronx New York. Cheever Development Corporation role as the Owner’s / Bank representative overseeing all activities of the General Contractor (Glenman Construction Co), Architects, Engineers and other Consultants.

Location
85 West Burnside, Bronx, New York 10453
Owner/Developer:


Cost:

Morris Heights Health Center
85 West Burnside, Bronx, New York 10453
Ms. Judith Fairweather (718-716-4400)
$30,000,000 +/-

Dartmouth Estates

Start 2/2009 - 6/2009

Takeover / Completion Construction of New Construction of two family houses in a Cluster of Seventy Houses located on Staten Island New York, after the prior General Contractor was defaulted by the Developer and Banco Popular, NA.

Location
55 Mill Road, Staten Island, New York
Owner/Developer:


Cost:

Mill Road Realty Development, LLC
1877 East 9th Street Brooklyn, New York 11233
Mr. Yehuda Lieb Purezt
$1,250,000

Marion – Sumpter New Foundation

Start 5/08 - 7/09

New construction of 11 three family homes on scattered sites on Marion and Sumpter Streets in Central Brooklyn, New York

Location
Marion and Sumpter Streets, Brooklyn, New York
Owner/Developer:

 

Cost:

Marion and Sumpter Streets, Brooklyn, New York
Marion - Sumpter Corporation
48 Liberty Ave., N. Rochelle, NY 10805
Mr. Getz Obstfeld (914) 235-7865
$6,347,000

Millennium Limited Partnership 

Start 4/09 - 7/09

Interior Renovation and Tenant Fit-Out of 18,000 square feet of Remote Data Center for a major NYSE trading Company. Cheever Development Corporation is the Owner’s representative / CM overseeing all activities of the General Contractor (Pavarini/Structuretone) and team of Architects and Engineers.

Location
44 Broadway South White Plains, New York
Owner/Developer:


Cost:

Integrated Holdings / MLP
666 Fifth Avenue, New York, NY
Mr. Jim Linden (212-841-4100)
$3,000,000

Millennium Limited Partnership

Start 1/08 - 5/09

Interior Renovation and Tenant Fit-Out of 125,000 square feet office space for a major NYSE trading Company. Cheever Development Corporation is the Owner’s representative / CM overseeing all activities of the General Contractor (Structure tone) and team of Architects and Engineers.

Location

666 Fifth Avenue, New York, New York

Owner/Developer:


Cost:

Integrated Holdings / MLP
666 Fifth Avenue, New York, NY
Mr. Kenneth Cummings (646-261-3992)
$53,000,000


Cleveland / Pitkin Cornerstone Houses

Start 1/08 – 2/09
Construction of New 11 two family homes on scattered sites in the East New York section of Brooklyn, New York. Project is monitored through HPD New Foundation Program
Location
Various locations in the East NY, Brooklyn, New York
Owner/Developer:


Cost:

Cleveland / Pitkin Corp.
48 Liberty Ave., N. Rochelle, NY 10805
Mr. Getz Obstfeld (914) 235-7865
$3,239,000

Gates Plaza Elderly Housing

Start 10/06 - 7/08

New construction of 67,000 sq. ft., 6 stories Pre-cast Hollow Core Concrete planks Floors, comprised of 83 apartments with community space, social services offices and library. Project is funded by U.S Housing and Urban Development.

Location
1245 Gates Avenue, Brooklyn, NY
Owner/Developer:

 

Cost:

Bushwick Ridgewood Senior Citizens
217 Wyckoff Avenue
Brooklyn, NY 11237
Ms. Angela Battaglia (718) 366-3800
$10,717,000

Bleecker Street Cluster

Start 3/05 - 3/08

Gut-Rehabilitation of twenty-one (21) scattered ANEP buildings@ comprised of one hundred thirty-five (135) apartments and seven commercial units. Project was funded by HPD NEP Program.

Location

Various locations in Bushwick - Brooklyn, NY

Owner/Developer:


Cost:

Serlin Building Management, Inc.
474 Central Avenue, Brooklyn, NY 11221
Mr. Sergio Benitez (718) 919-1661
$19,658,000

St. Johns House II

 Start 7/05 - 12/07

Construction of new 28,000 sq. ft., 6 stories comprised of 20 apartments with community spaces, social services offices and library. Super-structure consists of Steel frame skeleton, metal deck floors and concrete. Project was funded by HPD and NYS Programs.

Location
355 East 165th Street, Bronx, NY
Owner/Developer:



Cost:

St. Johns House II, L.P.
1182-84 Washington Avenue
Bronx, New York 10456
Mr. Vincent Christmas (718)-402-3704
$4,500,000

Bed-Stuy Estates HDFC

Start 5/05 - 5/07
Gut-Rehabilitation of ten (10) buildings in various sites comprised of twenty-four dwelling units. Project is funded by U.S Housing and Urban Development and NYC HPD
Location

Various locations in Bushwick - Brooklyn, NY

Owner/Developer:


Cost:

Bed-Stuy Estates Housing Dev. Fund Corp.
109 Ralph Avenue, Brooklyn, NY 11221
Mr. Getz Obstfeld (914) 235-7865
$3,305,000

Water Street Project 

Start 1/05 - 2/07

Owner/Developer - New construction of 32,000 square feet, 13 unit condominium located in Brooklyn Heights with underground car garage, ground floor restaurant  with on-site parking. Super-structure consists of Caisson Piles Foundation, Steel frames, metal decking and concrete floors etc.

Location
4-10 Water Street, Brooklyn, New York

Owner/Developer:


Cost:

4 Water Street LLC
48 Liberty Ave., New Rochelle, NY 10805
Mr. Getz Obstfeld (914) 235-7865
$10,000,000

Belmont Houses II/Euclid Homes

Start 8/05 - 9/06

Construction of 6 new two family homes on scattered sites in the East New York section of Brooklyn, New York. Project is funded by NYC Housing Partnership Program.

Location
Various locations in East New York, Brooklyn, NY
Owner/Developer:


Cost:

Belmont Homes Phase-2 Corp.
48 Liberty Avenue, New Rochelle, NY 10805
Mr. Getz Obstfeld (914) 235-7865
$1,700,000

Myrtle/Menahan Project

Start 7/04 - 5/05

Construction of new, 7500 square feet, one story retail space, consisting of 5 separate stores in the Bushwick section of Brooklyn, New York

Location
1485 Myrtle Avenue, Brooklyn, NY
Owner/Developer:

Cost:

Myrtle/Menahan LLC
48 Liberty Avenue, New Rochelle, NY 10805
Mr. Getz Obstfeld (914) 235-7865
$3,500,00

Bushwick Central II Partnership Homes 

Start 6/03 - 8/04
New construction of 31 numbers of two family homes on scattered sites in the East New York section of Brooklyn, New York
Location
Various locations in the East NY, Brooklyn, New York

Owner/Developer:


Cost:

Bushwick Central 2 Corp.
48 Liberty Ave., New Rochelle, NY 10805
Mr. Getz Obstfeld (914) 235-7865
$7,000,000

Belmont Ave. /East NY Partnership Homes 

Start 1/03 - 5/04

New Construction of 48, two family homes on scattered sites in the East New York section of Brooklyn, New York. The project was funded under the NYC Housing Preservation and Development new home program.

Location

Various locations in the East NY, Brooklyn, New York

Owner/Developer:


Cost:

Belmont New Homes Corp.
48 Liberty Ave., New Rochelle, NY 10805
Mr. Getz Obstfeld (914) 235-7865
$11,375,000

West 9th Street Project 

Start 7/01 - 9/02

Owner/Developer - New construction of 34,000 square feet, 3 story (middle income rental) apartment building consisting of 26 loft type dwelling units with on-site parking.

Location

64-78 West 9th Street, Brooklyn, NY

Owner/Developer:

Cost:

64-78 West 9th LLC
C/o Cheever Development Corporation
60 Sackett St., Brooklyn, NY 11231
Mr. Matthew Lonuzzi - (718) 834-0770
$3,853,000

Powell Plaza Project 

Start 7/01- 8/02

Gut Rehabilitation conversion of four (4) buildings encompassing 46,000 square feet to one (1) building consisting of 36 condominiums and 3 storefronts.

Location
2322-2328 Adam Clayton Powell Jr. Blvd, New York, New York
Owner/Developer:


Cost:

Powell Plaza Housing Development Fund, Inc.
48 Liberty Ave., N. Rochelle, NY 10805
Mr. Getz Obstfeld - (914) 235-7865
$4,050,000

Bushwick-Ridgewood Properties 

Start 10/00 - 10/02

Gut Rehabilitation of twenty-five (25) scattered NEP buildings comprised of 114 apartments and 5 commercial units.

Location
Various locations in Bushwick, Brooklyn, NY
Owner/Developer:


Cost:

Bushwick-Ridgewood Properties, Inc.
3835 Richmond Ave., S.I., NY 10312
Mr. Sergio Benitez - (718) 980-4315
$15,000,000

Creston Avenue Cluster

Start 8/99 - 8/01
Gut Rehabilitation of seven (7) scattered ANEP buildings@ comprised of one hundred fifty three apartments, coupled with one storefront.
Location

2031, 2064 & 2070 Creston Ave., 2349 Jerome Ave.,
Walton Ave., E. 204 St. & Grand Ave., Bronx, NY

Owner/Developer:


Cost:

Creswalt Cluster LLC
2488 Grand Concourse, Bronx, NY 10458
Mr. Ramon Escobar - (718) 365-8620
$12,238,000.

Sutphin Blvd. Project 

Start 8/99 - 3/00

Gut Rehabilitation of four (4) buildings comprised of fifteen (15) apartments and one (1) office.

Location

109-02/04 & 110-18/20 Sutphin Boulevard
Jamaica, New York

Owner/Developer:


Cost:

Sutphin-Veterans L.P.
48 Liberty Ave., N. Rochelle, NY 10805
Getz Obstfeld (914) 235-7865
$1,600,000


Degraw Street Project

Start 8/98 - 6/99

Owner/Developer - Gut Rehabilitation conversion of a parochial school encompassing 80,000 square feet to ninety (90) middle income loft type apartments.

Location

421 Degraw Street,     Brooklyn, N.Y.  11217

Owner/Developer:


Cost:

421 Degraw LLC
C/o Cheever Development Corporation
60 Sackett Street, Brooklyn, NY 11231
Mr. Matthew Lonuzzi - (718) 834-0770
$8,000,000

Board of Elections Project

Start 5/98 - 5/99

Gut Rehabilitation of 54,000 square feet warehouse to administrative offices and storage.

Location

1780 Grand Concourse, Bronx, N.Y. 

Owner/Developer:


Cost:

Goldfarb Properties, Inc.
524 North Avenue, N. Rochelle, NY 10801
Mr. Tim Ross - (914) 235-3200
$2,848,000

Bushwick Housing Project

Start 8/97 - 2/99

Construction of nineteen (19) scattered NEP buildings composed of 118 apartments and 3 commercial units.


Location
Various addresses in Bushwick Area, Brooklyn, NY
Owner/Developer:


Cost:

Bushwick Properties, Inc.
3835 Richmond Ave., S.I., NY 10312
Mr. Sergio Benitez - (718) 980-4315
$10,000,000

Hanson Place Project

Start 5/97 - 2/99

Rehabilitation of a 16 story landmark building composed of 111 apartments, coupled with three storefronts and a corporate office.

Location
67 & 75 Hanson Place, Brooklyn, NY
Owner/Developer:


Cost:

B.E.C. New Communities
541 Atlantic Ave., Brooklyn, NY
Mr. Dan Matthew - (718) 858-8803
$7,200,000

Park Place Project

Start 8/96 - 1/97

Moderate rehabilitation of an occupied building composed of 34 apartments.  Responsible for all aspects of general construction

Location

1544 Park Place, Brooklyn, N.Y.

Owner/Developer:


Cost:

1544 Park Associates, L.P.
48 Liberty Ave., New Rochelle, NY
(914) 235-7865
$1,100,000

Acorn Community High School 

Start 7/95 - 6/96

Owner/Developer - Gut rehab and conversion of existing warehouse, comprising of an 82,000 square feet six story building to New York City High Scholl. Work performed on this project includes installation of new classrooms, library, offices, commercial type kitchen and equipment, gymnasium science laboratories and sophisticated computer equipment.

Location

561 Grand Ave., Brooklyn, N.Y.

Owner/Developer:


Cost:

Community Developers Inc.
C/o Cheever Development Corporation
60 Sackett Street, Brooklyn, NY 11231
Mr. Matthew Lonuzzi (718) 834-0770
$10,000,000

Woodruff Avenue Project

Start 2/96 - 4/97

Construction of twenty-seven (27) residential units and a 7,500 square foot Day Treatment Center for the Office of Mental Retardation and Development Disabilities

Location

161 Woodruff Street, Brooklyn, N.Y.

Owner/Developer:

Cost:

Community Developers Inc.
Mr. Getz Obstfeld ((914) 235-7865)
$3,300,000

Columbia Street Project 

Start 12/95 - 10/96

Owner/Developer - Gut Rehab of a five story building; first two stories to be renovated into a twelve bed intermediate care facility for mentally retarded/developmentally disabled individuals, remaining three floors will be made into 14 apartments.

Location

296-8 Columbia Street, Brooklyn, N.Y.

Owner:


Cost:

Columbia Street L.P.
60 Sackett St., Brooklyn, NY 11231
Mr. Matthew Lonuzzi (718) 834-0770
$3,300,000

Henry Street Project

Started 4/95 - 6/96

Gut rehabilitation of thirty-one (31) single Room Occupancy (SRO) units in one building encompassing 8,500 square feet.
Project was funded in part by NYC Housing Preservation and Development.


Location

713-715 Henry Street, Brooklyn, N.Y.

Owner:

Cost:

Turning Point Red Hook, HDFC
Mr. Ray Figueroa (718) 851-6114
$1,600,000

University Avenue Project

Start 2/95 - 1/96
Gut rehabilitation of thirty-four (34) SRO units in one building encompassing 15,000 square feet. Project was funded by NYC HPD
Location

1628 University Avenue, Bronx, New York

Owner/Developer:


Cost:

Ilene R. Smith Limited Partnership
695 East 170th Street, Bronx, NY
Ms. Eleanor Clark (718) 991-0071
$1,700,000

Morris Heights Beulah Association

Start 1/94 - 8/95

Complete gut rehabilitation of three buildings composed of sixty-eight (68) residential units located in Bronx, New York.

Location

94 & 95 Brandt Place and 1632 University Avenue

Owner/Developer:


Cost:

South Bronx Churches
94 Brandt Place, Bronx, N.Y. 10456
Mr. Brodie Hefner - (718) 901-3143
$4,675,000

Madison Avenue Rehabilitation

Start 11/93 - 11/95

Gut rehab of twenty residential units located at 16-18 East 132nd Street, NYC, N.Y., coupled with new construction of one building composed of ten residential apartments at 12 E. 132nd Street, NYC, NY


Location


16-18 East 132nd Street, NYC, N.Y.

Owner/Developer:

Cost:

New York City Housing Authority
Joe Nanartowich (212) 306-4361
$2,257,00

56th Street Project
Start 10/93 - 9/94

Construction of a new 5,000 square foot brick ranch building for the mentally retarded and developmentally disabled located at 60-12 56th Street, Maspeth, New York.

Owner/Developer:


Cost:

Heartshare Human Services of New York
Ms. Katie Meskel (718) 330-1806

$1,750,000

NYS Motor Vehicle of Brooklyn 
Start 9/92 - 6/93

Owner/Developer - Responsible for the construction of a one story building encompassing 50,000 sq. ft. designed and built in accordance to tenant specification including 2  acres for a 400 vehicle parking facility.

Location

2875 West 8th Street, Brooklyn, NY

Owner/Developer:

2875 West Eighth Street Associates
Mr. Matthew Lonuzzi (718) 834-0770

Development Cost:

$6,500,000

Paul Robeson High School

Start 8/92 -4/97

Gut rehabilitation work including but not limited to, installation of a gymnasium, cafeteria, computer rooms, woodshop room, photography rooms, and laboratories.

Location
128 Albany Avenue, Brooklyn, NY 11213

Owner/Developer:


Cost:

N.Y.C. School Construction Authority
30-30 Thomson Ave., L.I.C., NY 11101
Mr. Fuad Motia, 718) 472-8145
$24,000,000

Citi Line Housing

Start 11/91 - 3/93

Complete Gut Rehab of 66 residential units located in Brooklyn, New York.

Owners:

New York City Housing Authority
123 William Street, New York, NY
Joe Nanartowich (212) 306-4361

Cost:

$2,319,000

Southern Boulevard Project 

Start 11/91 - 3/9

Complete gut rehabilitation of 44 residential units located in the Bronx, New York (HPD funded).

Owner/Developer:


Cost:


Dept. of Housing Preservation & Development

100 Gold Street, New York, NY
John Caldwell (212) 806-8731
$1,974,000

Cypress Apartments 

Start 9/91 - 11/92

Complete gut rehab of twenty-seven (27) residential units located in Brooklyn, New York.

Owner/Developer:

Cost:

Cypress Hill Development Corp.
Michelle Neugenbauer (718) 647-2800
$1,850,000

Bill Rainey Houses

Start 8/90 - 10/91

Complete gut rehab of fifty-five (55) residential units located in the Bronx, New York.

Owner/Developer:

Cost:

Banana Kelly Associates
Getz Obstfeld (212) 328-1064
$3,781,250

Nelson Avenue Rehabilitation 

Start 5/90 - 5/92

Complete gut rehabilitation of eighty-one (81) residential units in Bronx, NY also a one acre park area.


Owner
s:

Dept. of Housing Preservation & Development

Construction Managers:


Cost:

New York City Housing Authority
Joe Nanartowich (212) 306-4361

$4,415,000

Riga Avenue Project 

Start 6/90 -5/91

Construction of five (5) new two family homes located at 573-581 Riga Avenue, Staten Island, N.Y. composed of wood frame with brick veneer.


Location

573-581 Riga Avenue, Staten Island, N.Y
Owner/Developer:

Riga Avenue Realty
Andrew Leider (718) 522-6400

Tiffany Mews
Start 6/89 - 3/91

General Contractor for complete gut rehab of existing building into 134 Luxury apartment units located at 27-63 Tiffany Place Brooklyn, N.Y.

Location

Owner/Developer:

Cost:

Tiffany Mews Association
Andrew Leider (718) 522-6400
$11,650,000

Ogden Avenue Rehabilitation 

Start 1988 - 10/90

Complete gut rehab of building (169 units) for the New York City Housing Authority located at 1360,1372,1376,1380,1386,1390 Ogden Ave., 1341,1345 Plimpton Ave, Bronx, N.Y.

Owners:

Cost:

New York City Housing Authority
Joe Nanartowich (212) 306-4361
$8,319,200

Calvary Baptist Church Housing for the Elderly

Start 3/90 - 7/91

New construction of a 6 story, 100 apartments building composed of block and plank, responsible for all aspect of general construction.

Architect:


Cost:

Grasso-Menziuso Associates, P.C. - Architects, A.I.A.
300 East 34th Street, New York, N.Y.  10016
Contact: Mr. Christopher T. Menziuso
(212) 779-0257
$8,100,000

College Point Project

Start 10/88-11/89

Constructed twenty-seven (27) new three family homes located at 105th Street and Fifth Avenue, College Point, N.Y. composed of panelized light gauge steel framing system.

Owner/Developer:

Bruno Frustaci, Inc.
Emillio Locassio (718) 567-0229


Cost:

$5,180,000

182 Bay 22nd Street

 Start 1988 – 1989

General Construction of sixteen (16) Luxury Housing Units located at 182 Bay 22nd Street, Brooklyn, N.Y.

Owner:

Cost:

Palerna Realty 
Nick Argano (718) 738-5536
$1,290,000

Clinton Mews 

Start 1987 - 1988

Complete gut rehab of seventy-eight (78) luxury apartment units located at 372 Dekalb Ave, Brooklyn, N.Y.

Owners:

Cost:

Clinton Mews Association
Charles Hack - (212) 972-2310
$5,450,000

Delafield Estates

Start 9/86 - 8/87

Constructed seventeen (17) new two family homes located at 246th Street and Riverdale Avenue, Bronx, N.Y. composed of wood frame with brick veneer.

Owner/Developer:

Cost:

Bruno Frustaci Inc.
Emillio Locassio (718) 567-0229:
$3,200,000

One Tiffany Place

Start 1985 - 1986
Developer & Contractor
Complete gut rehab of seventy (70) luxury apartment units located at 1 Tiffany Place, Brooklyn, N.Y.

Owners:

Cost:

1 Tiffany Place Assoc.
Andrew Leider (718) 522-6400
$6,000,000

Cooper Square Project 
Start 11/85 - 11/86

Construction of new cooperative building (36 units) located at 63-65 Cooper Square, New York, New York

Owner/Developer:

Cost:

Gellar Development
Emillio Locassio (718) 567-0229
$3,100,000

 

BEVERLY’S PLACE, BROOKLYN, NEW YORK


beverlys Place lg

BEVERLY’S PLACE, BROOKLYN, NEW YORK

 

JERICHO APARTMENTS, BRONX, NEW YORK

 

SERVIAM HEIGHTS, BRONX, NEW YORK

 

THE GLENMORE (STONE HOUSE), BROOKLYN, NY

 

GATEWAY - ELTON PHASE-2, BROOKLYN, NEW YORK

 

GATEWAY-ELTON PHASE-1, BROOKLYN, NEW YORK

 

GATEWAY-ELTON PHASE -2, BROOKLYN, NEW YORK

 

COUNCIL TOWER V, BRONX, NEW YORK

 

GATES PLAZA, BROOKLYN, NEW YORK

ACORN HIGH SCHOOL, BROOKLYN, NY

 

ACORN HIGH SCHOOL FOR SOCIAL JUSTICE, BROOKLYN, NY

 

4 WATER STREET CONDO, BROOKLYN, NEW YORK

 

ACORN HIGH SCHOOL FOR SOCIAL JUSTICE, BROOKLYN, NY

 

EBC HIGH SCHOOL FOR
PUBLIC SERVICE, BROOKLYN, NY

 

4 WATER STREET CONDO, BROOKLYN, NEW YORK

 

CORETTA-SCOTT KING SENIOR HOUSING

 

CORETTA-SCOTT KING SENIOR HOUSING

 

CORETTA-SCOTT KING SENIOR HOUSING

 

QUEENS ANIMAL CARE SHELTER