PROJECTS IN PLANNING
These are projects whereby Cheever Development Corporation have been designated and approved as the General Contractor. These projects are in final stages of Design development and Department of Buildings activities. Shown are approximate construction start dates.
|
|
|
Construction of New
Affordable apartment housing for Seniors, comprising of approximately 107,000 GSF, 104 units, Ten stories tall with partial finished Basement, Urban Farm of approximately 11,000 GSF on the 1st floor and Green House of approximately 8,000 GSF on the roof floor. The project will provide for on-premises Senior Center and large contingent of common areas recreational space for the residents. The building will be designed to meet NYSERDA and Green Communities environmental criteria. The building structure will comprise Cast-InPlace Concrete Floors and Columns, Masonry bearing walls, combination brick and rains screen facades, two access elevators and enhanced a high level interior finishes etc. Gardens, terraces and extensive outdoor spaces. |
Location: |
485-515 Van Sinderen Avenue, Brooklyn, New York
|
Owner/Developer: |
Community Counseling & Mediation
25 Elm Street, Brooklyn, New York 11201 Emory Brooks (CEO) |
Cost: |
TBD |
Start Date: |
TBD |
Beverly’s Place. Start:____________________________________ Dec. 2017 – Sep. 2019
Construction of New Supportive Affordable apartment housing, comprising of approximately 64.265 GSF, 72 units, Six stories tall plus full finished basement. The project will provide for on- premises supportive services and large contingent of common areas recreational space for the residents. The building is designed to meet NYSERDA and Green Communities environmental criteria. The building structure comprises of Precast Hollow Core Concrete planks Floors, Masonry bearing walls, combination brick and rains screen facades, two access elevators and enhanced a high level interior finishes etc. Intensive Green Roof, terraces and extensive outdoor spaces.
|
Location: |
402-422 Snediker Avenue, Brooklyn, New York
|
Owner/Developer: |
Beverly’s Place L.P & Beverly’s Place HDFC
25 Elm Street, Brooklyn, New York 11201
Emory Brooks (CEO) – 718-935-9147 / 718-802-0666 |
Projected Cost: |
$21,284,884 |
PARTIAL LIST COMPLETED PROJECTS
Construction of New affordable housing comprising of approximately 53,000 GSF, 90 units of Single Room Occupancy (SRO), ten stories high plus full finished basement. The project is a joint venture partnership between B & B Supportive housing and Jericho Project. The project will provide for on-premises supportive services and large contingent of common areas
recreational space for the residents. The building is designed to meet NYSERDA and Green
Communities environmental criteria. The building structure comprises of Pre-cast Hollow
Core Concrete planks Floors, Masonry bearing walls and interior drywall partitions etc. Roof
terraces and extensive outdoor spaces.
|
Location: |
2065 Walton Avenue, Bronx, New York
|
Owner/Developer: |
Jericho 2065 Walton Ave. Housing Dev. Fund Corporation
& 2065 Walton Avenue Associates, LLC
245 West 29th Street, Suite 902, New York, New York 10001 Tori Lyon - (646-624-2341) |
Projected Cost: |
$23,192,733 |
SERVIAM Heights Start: Jan. 2016 – May 2018
Construction of New affordable housing apartments comprising of 140 units of One bedroom apartments and renovation of another existing building comprising of 57 units One bedroom apartments. The entire project consisting of the two major buildings will be 197 apartments and 183,000 GSF. The project is funded via Low Income Housing Tax Credit, NYC HPD and US Housing and Urban Development (HUD). The building structure comprises of Pre-cast Hollow Core Concrete planks Floors, Masonry bearing wall and interior drywall partitions etc. Interior Community spaces, roof terraces and extensive outdoor playground areas and parking amenities.
|
Location: |
2848 Bainbridge Avenue, Bronx, New York
|
Owner/Developer: |
Fordham-Bedford Housing Development Corporation
2751 Grand Concourse, Bronx, New York 10468 Rosanna Viera - (718-367-3200) |
Projected Cost: |
$56,436,000 |
v
The Glenmore Start: Oct. 2015
Affordable Housing for Women-in-Need, specifically targeted for low income families. The project is funded via Low Income Housing Tax Credit, NYC HPD and New York State Homeless Housing Assistance Program (HHAP). The building 176,000 Gross Square Feet and there will be combined total 161 one bedroom and Studio apartments with Social Services office and other support spaces. The building structure comprises of Pre-cast Hollow Core Concrete planks Floors, Masonry bearing wall and interior drywall partitions etc. Outdoor playground areas and parking site amenities.
|
Location: |
Junius Street, Brooklyn, New York
|
Owner/Developer: |
WIN GLENMORE HDFC & GLENMORE HOUSING ASSOC.
115 West 31st Street, New York, New York 10001
Jerry Mascuch - (212-560-0225) |
Projected Cost: |
$52,863,000 |
261 Van Brunt St. Brooklyn Start: Feb. 2015 – September 2016
New construction of 20,000 gross square feet and 4 stories high mix-use development. The building will consist of one and two bedrooms residential and commercial spaces at the ground level, plus full basement support spaces. There will be 27 apartments at completion. The building structure comprises of Pre-cast Hollow Core Concrete planks Floors, Masonry bearing wall and facades, passenger elevators and interior drywall partitions etc.
|
Location: |
261 Van Brunt Street, Brooklyn, New York
|
Owner/Developer: |
Cheever Development Corporation
60 Sackett Street, Brooklyn, New York 11231 Mr. Matthew Lonuzzi (718) 834-0770 |
Cost: |
$$3,800,000 |
PROJECTS IN PROGRESS
Corretta Scott-King Apartments Start: July, 2013 — Aug. 2015
HUD and HPD funded 202 Housing Program, New construction of 45,000 sq. ft., 4 stories Elderly Housing. There will be 51 one bedroom apartments with Social Services and other support spaces. The building structure comprises of Pre-cast Hollow Core Concrete planks Floors, Masonry bearing wall and interior drywall partitions etc.
|
Location: |
Corner of McClancy Place & Jerome Avenue, Brooklyn New York
|
Owner/Developer: |
Community Partners Commission & Association, Inc.
3227 Mickle Avenue, Brooklyn New York 10469
Dedra Wade, President (718-652-5358) |
Cost: |
$11,658,000 |
PARTIAL LIST OF COMPLETED PROJECTS
Gateway-Elton Street Building Phase-2 Start Feb. 2013-Aug. 2015
New construction of three (3) buildings within the same Cluster of approximately 209, 000 gross square feet. The project consists of 175 residential units, 6 Retail Spaces, ancillary spaces and full roofs Solar Panel Super structures. The buildings are Five and Six stories high, and the main super structure consist of precast concrete plank floors, composite masonry bearing walls and facades, wood piles cast in place _ concrete grade beams foundation structure.
|
Location: |
516, 524 Vandalia Ave., 526 Schroeders Ave., Brooklyn, New York
|
Owner/Developer: |
Elton Owner 1 LLC / Hudson Companies, Inc.
826 Broadway New York, New York
Mr. Aaron Koffman (212-777-9500) |
Cost: |
$42,000,000 +/- |
Millennium Limited Partnership Start: Sept. 2012- Jan.
|
|
Interior Renovation and Tenant Fit-Out of 6,000 square feet demised space within an existing multi- tenant office building, consisting of new trading cubicles, A/C ductwork extensions, electrical, telecommunication, data control, center for a major NYSE trading Company. Cheever Development Corporation is the Owner's representative / CM overseeing all activities of the General Contractor (RELATED) and team of Architects and Engineers. |
Location: |
1700 East Putnam Avenue, old Greenwich, Connecticut
|
Owner/Developer: |
Integrated Holdings / MLP
666 Fifth Avenue, New York, NY Mr. James Sheridan (212-708-4789) |
Cost: |
$1,950,000 |
Gateway-Elton Street Building Phase-1 Start 12/2011 |
|
New construction of four (4) buildings within the same Cluster of approximately 215, 000 gross square feet. The project consists of 197 residential units, 7 Retail Spaces, One full Daycare Center and ancillary spaces and full roofs Solar Panel / Super structures. The buildings are Five and Six stories high, and the main super structure consist of precast concrete plank floors, composite masonry bearing walls and facades, wood piles and cast in place concrete grade beams foundation structure. |
Location: |
1149, 1152, 1165, 1166 Elton Street Brooklyn, New York
|
Owner/Developer: |
Elton Owner 1 LLC / Hudson Companies, Inc.
826 Broadway New York, New York
Mr. Aaron Koffman (212-777-9500) |
Cost: |
$46,000,000 +/- |
Council Tower V Senior Housing Start 12/2009-8/2011
|
|
New Construction of 70,000 square feet, 11 stories precast Hollow Core Concrete Planks Floors, comprised of 71 apartments with Community spaces, social services offices and library. The project is funded by U.S. Housing and Urban Development, under the 202 Elderly Housing Program. |
|
Location: |
789 Co-Op City Blvd, Bronx, New York
|
Owner/Developer: |
Metropolitan Council on Jewish Poverty 80 Maiden Lane
New York, NY 10012
Mr. Gary Gutterman (212-453-9559) |
Cost: |
$16,190,000 |
NHP Abba Homes, LLC Start 9/2010-8/2011
Gut rehabilitation of ten (10) building in various sites comprised of twenty four residential dwelling units. Project was a takeover from prior contractor who was defaulted by the Owner and HPD, and funded by the U.S Housing and Urban Development and NYC Housing Preservation and Development
|
Location: |
Various Sites - Brooklyn, NY
|
Owner/Developer: |
ABBA HOMES, LLC
1158 Intervale Avenue Bronx, New York 10459 Mr. Richard Ortiz (347) 664-4843 |
Cost: |
$1,750,000 |
Harrison Circle — Morris Height Medical Center Start 1/2008 - 11/2010
Owner Representative of a New Construction of Residential, Commercial and Community Health Center located in the Bronx New York. Cheever Development Corporation role as the Owner's / Bank representative overseeing all activities of the General Contractor (Glenman Construction Co), Architects, Engineers and other Consultants.
|
Location: |
85 West Burnside, Bronx, New York 10453
|
Owner/Developer: |
Morris Heights Health Center
85 West Burnside, Bronx, New York 10453
Ms. Judith Fairweather (718-716-4400) |
Cost: |
$30,000,000 +/- |
Dartmouth Estates Start 2/2009 - 6/2009
Takeover / Completion Construction of New Construction of two family houses in a Cluster of Seventy Houses located on Staten Island New York, after the prior General Contractor was defaulted by the Developer and Banco Popular, NA.
|
Location: |
55 Mill Road, Staten Island, New
|
Owner/Developer: |
Mill Road Realty Development, LLC
1877 East 9th Street Brooklyn, New York 11233
Mr. Yehuda Lieb Purezt |
Cost: |
$1,250,000 |
Marion — Sumpter New Foundation |
Start 5/08 - 7/09
|
New construction of 11 three family homes on scattered sites on Marion and Sumpter Streets in Central Brooklyn, New York.
|
Location: |
Marion and Sumpter Streets, Brooklyn, New York
|
Owner/Developer: |
Marion - Sumpter Corporation
48 Liberty Ave., N. Rochelle, NY 10805
Mr. Getz Obstfeld (914) 235-7865 |
Cost: |
$6,347,000 |
St. Johns House II Start 7/05 - 12/07
Construction of new 28,000 sq. ft., 6 stories comprised of 20 apartments with community spaces, social services offices and library. Super-structure consists of Steel frame skeleton, metal deck floors and concrete.
|
Location: |
355 East 165th Street, Bronx, NY
|
Owner/Developer: |
St. Johns House II, L.P.
1182-84 Washington Avenue
Bronx, New York 10456
Mr. Vincent Christmas (718)-402-3704 |
Cost: |
$4,500,000 |
Millennium Limited Partnership____________________________ Start 1/08 - 5/09
Interior Renovation and Tenant Fit-Out of 125,000 square feet office space for a major NYSE trading Company. Cheever Development Corporation is the Owner's representative / CM overseeing all activities of the General Contractor (Structure tone) and team of Architects and Engineers..
|
Location: |
666 Fifth Avenue, New York, New York
|
Owner/Developer: |
Integrated Holdings / MLP
666 Fifth Avenue, New York, NY
Mr. Kenneth Cummings (646-261-3992) |
Cost: |
$53,000,000 |
Cleveland / Pitkin Cornerstone Houses Start 1/08 — 2/
Construction of New 11 two family homes on scattered sites in the East New York section of Brooklyn, New York. Project is monitored through HPD New Foundation Program.
|
Location: |
Various locations in the East NY, Brooklyn, New York
|
Owner/Developer: |
Cleveland / Pitkin Corp.
48 Liberty Ave., N. Rochelle, NY 10805
Mr. Getz Obstfeld (914) 235-7865 |
Cost: |
$3,239,000 |
Gates Plaza Elderly Housing Start 10/06 - 7/08
New construction of 67,000 sq. ft., 6 stories Pre-cast Hollow Core Concrete planks Floors, comprised of 83 apartments with community space, social services offices and library. Project is funded by U.S Housing and Urban Development..
|
Location: |
1245 Gates Avenue, Brooklyn, NY
|
Owner/Developer: |
Bushwick Ridgewood Senior Citizens 217 Wyckoff Avenue
Brooklyn, NY 11237
Ms. Angela Battaglia (718) 366-3800 |
Cost: |
$1,700,000 |
Bleecker Street Cluster Start 3/05 - 3/08
Gut-Rehabilitation of twenty-one (21) scattered ANEP buildings@ comprised of one hundred thirty- five (135) apartments and seven commercial units. Project was funded by HPD NEP Program.
|
Location: |
Various locations in Bush wick - Brooklyn,
|
Owner/Developer: |
Serlin Building Management, Inc.
474 Central Avenue, Brooklyn, NY 11221
Mr. Sergio Benitez (718) 919-1661 |
Cost: |
$19,658,000 |
St. Johns House H Start 7/05 - 12/07
Construction of new 28,000 sq. ft., 6 stories comprised of 20 apartments with community spaces, social services offices and library. Super-structure consists of Steel frame skeleton, metal deck floors and concrete. Project was funded by HPD and NYS Programs.
|
Location: |
355 East 165th Street, Bronx, NY
|
Owner/Developer: |
St. Johns House II, L.P.
1182-84 Washington Avenue
Bronx, New York 10456
Mr. Vincent Christmas (718)-402-3704 |
Cost: |
$4,500,000 |
Bed-Stuy Estates HDFC Start 5/05 - 5/
Gut-Rehabilitation of ten (10) buildings in various sites comprised of twenty-four dwelling units. Project is funded by U.S Housing and Urban Development and NYC HPD.
|
Location: |
Various locations in Bushwick - Brooklyn, NY
|
Owner/Developer: |
Bed-Stuy Estates Housing Dev. Fund Corp.
109 Ralph Avenue, Brooklyn, NY 11221
Mr. Getz Obstfeld (914) 235-7865 |
Cost: |
$3,305,000 |
Water Street Project Start 1/05 - 2/07
New construction of 32,000 square feet, 13 unit condominium located in Brooklyn Heights with underground car garage, ground floor restaurant with on-site parking. Superstructure consists of Caisson Piles Foundation, Steel frames, metal decking and concrete floors etc.
|
Location: |
4-10 Water Street, Brooklyn, New York
|
Owner/Developer: |
4 Water Street LLC
48 Liberty Ave., New Rochelle, NY 10805
Mr. Getz Obstfeld (914) 235-7865 |
Cost: |
$10,000,000 |
Belmont Houses II/Euclid Homes Start 8/05 - 9/06
Construction of 6 new two family homes on scattered sites in the East New York section of Brooklyn, New York. Project is funded by NYC Housing Partnership Program.
|
Location: |
Various locations in East New York, Brooklyn, NY
|
Owner/Developer: |
Belmont Homes Phase-2 Corp.
48 Liberty Avenue, New Rochelle, NY 10805
Mr. Getz Obstfeld (914) 235-7865 |
Cost: |
$1,700,000 |
Myrtle/Menahan Project Start 7/04 - 5/05
Construction of new, 7500 square feet, one story retail space, consisting of 5 separate stores in the Bushwick section of Brooklyn, New York
|
Location: |
1485 Myrtle Avenue, Brooklyn, Y
|
Owner: |
Myrtle/Menahan LLC
48 Liberty Avenue, New Rochelle, NY 10805
Mr. Getz Obstfeld (914) 235-7865 |
Cost: |
$3,500,00 |
Bushwick Central II Partnership Homes Start 6/03 - 8/04
w construction of 31 numbers of two family homes on scattered sites in the East New York section of Brooklyn, New York.
|
Location: |
Various locations in the East NY, Brooklyn, New York
|
Owner/Developer: |
Bushwick Central 2 Corp.
48 Liberty Ave., New Rochelle, NY 10805
Mr. Getz Obstfeld (914) 235-7865 |
Cost: |
$7,000,000 |
Belmont Ave. /East NY Partnership Homes Start 1/03 - 5/04
New Construction of 48, two family homes on scattered sites in the East New York section of Brooklyn, New York. The project was funded under the NYC Housing Preservation and Development new home program.
|
Location: |
Various locations in the East NY, Brooklyn, New York
|
Owner/Developer: |
Belmont New Homes Corp.
48 Liberty Ave., New Rochelle, NY 10805
Mr. Getz Obstfeld (914) 235-7865 |
Cost: |
$11,375,000 |
West 9th Street Project Start 7/01 - 9/02
Owner/Developer - Gut Rehabilitation conversion of a parochial school encompassing 80,000 square feet to ninety (90) middle income loft type apartments.
|
Location: |
64-78 West 9th Street, Brooklyn,
|
Owner/Developer: |
64-78 West 9th LLC
C/o Cheever Development Corporation
60 Sackett St., Brooklyn, NY 11231
Mr. Matthew Lonuzzi - (718) 834-0770 |
Cost: |
$3,853,000 |
Powell Plaza Project Start 7/01- 8/02
Gut Rehabilitation conversion of four (4) buildings encompassing 46,000 square feet to one (1) building consisting of 36 condominiums and 3 storefronts.
|
Location: |
2322-2328 Adam Clayton Powell Jr. Blvd, New York, New York
|
Owner: |
Powell Plaza Housing Development Fund, Inc.
48 Liberty Ave., N. Rochelle, NY 10805
Mr. Getz Obstfeld - (914) 235-7865 |
Cost: |
$4,050,000 |
Bushwick-Ridgewood Properties Start 10/00 - 10/02
Gut Rehabilitation of twenty-five (25) scattered NEP buildings comprised of 114 apartments and 5 commercial units.
|
Location: |
Various locations in Bushwick, Brooklyn, NY
|
Owner: |
Bushwick-Ridgewood Properties, Inc.
3835 Richmond Ave., S.I., NY 10312
Mr. Sergio Benitez - (718) 980-4315 |
Cost: |
$15,000,000 |
Creston Avenue Cluster Start 8/99 - 8/01
Gut Rehabilitation of seven (7) scattered ANEP buildings@ comprised of one hundred fifty three apartments, coupled with one storefront.
|
Location: |
2031, 2064 & 2070 Creston Ave., 2349 Jerome Ave.,
|
Owner: |
Walton Ave., E. 204 St. & Grand Ave., Bronx, NY
Creswalt Cluster LLC
2488 Grand Concourse, Bronx, NY 10458
Mr. Ramon Escobar - (718) 365-8620 |
Cost: |
$12,238,000. |
Sutphin Blvd. Project Start 8/99 - 3/00
Gut Rehabilitation of four (4) buildings comprised of fifteen (15) apartments and one (1) office.
|
Location: |
109-02/04 & 110-18/20 Sutphin Boulevard
Jamaica, New York
|
Owner: |
Sutphin-Veterans L.P.
48 Liberty Ave., N. Rochelle, NY 10805
Getz Obstfeld (914) 235-7865 |
Cost: |
$1,600,000 |
Degraw Street Project Start 8/98 - 6/99
Owner/Developer - Gut Rehabilitation conversion of a parochial school encompassing 80,000 square feet to ninety (90) middle income loft type apartments
|
Location: |
421 Degraw Street, Brooklyn, N.Y. 11217
|
Owner: |
421 Degraw LLC
C/o Cheever Development Corporation
60 Sackett Street, Brooklyn, NY 11231
Mr. Matthew Lonuzzi - (718) 834-0770 |
Cost: |
$8,000,000 |
Board of Elections Project Start 5/98 - 5/99
Gut Rehabilitation of 54,000 square feet warehouse to administrative offices and storage.
|
Location: |
1780 Grand Concourse, Bronx, N.Y.
|
Owner/Developer: |
Goldfarb Properties, Inc.
524 North Avenue, N. Rochelle, NY 10801
Mr. Tim Ross - (914) 235-3200
|
Cost: |
$2,848,000 |
Ogden Avenue Residence Start 11/97 - 11/98
Gut Rehabilitation of six contiguous buildings into forty (40) SRO apartments, coupled with five storefronts and offices.
|
Location: |
156 W. 164th Street, Bronx, N.Y. 10455
|
Owner: |
163rd Street Improvement Council
1180 Rev. James A. Polite Avenue Bronx, N.Y. 10459
Ms. Dixon - (718) 589-5080 |
Cost: |
$3,294,000 |
Bushwick Housing Project Start 8/97 - 2/99
Construction of nineteen (19) scattered NEP buildings composed of 118 apartments and 3 commercial units.
|
Location: |
Various addresses in Bushwick Area, Brooklyn, NY
|
Owners: |
Bushwick Properties, Inc.
3835 Richmond Ave., S.I., NY 10312
Mr. Sergio Benitez - (718) 980-4315 |
Cost: |
$10,000,000 |
Hanson Place Project Start 5/97 - 2/99
Rehabilitation of a 16 story landmark building composed of 111 apartments, coupled with three storefronts and a corporate office.
|
Location: |
67 & 75 Hanson Place, Brooklyn, NY
|
Owner: |
B.E.C. New Communities
541 Atlantic Ave., Brooklyn, NY
. Dan Matthew - (718) 858-8803 |
Cost: |
$7,200,000 |
Park Place Project Start 8/96 - 1/97
Moderate rehabilitation of an occupied building composed of 34 apartments. Responsible for all aspects of general construction
|
Location: |
1544 Park Place, Brooklyn, N.Y.
|
Owner: |
1544 Park Associates, L.P.
48 Liberty Ave., New Rochelle, NY
(914) 235-7865
|
Cost: |
$1,100,000 |
Acorn Community High School Start 7/95 - 6/96
Owner/Developer - Gut rehab and conversion of existing warehouse, comprising of an 82,000 square feet six story building to New York City High Scholl. Work performed on this project includes installation of new classrooms, library, offices, commercial type kitchen and equipment, gymnasium science laboratories and sophisticated computer equipment.
|
Location: |
561 Grand Ave., Brooklyn, N.Y.
|
Owner: |
Community Developers Inc.
C/o Cheever Development Corporation
60 Sackett Street, Brooklyn, NY 11231
Mr. Matthew Lonuzzi (718) 834-0770 |
Cost: |
$10,000,000 |
Woodruff Avenue Project Start 2/96 - 4/97
Construction of twenty-seven (27) residential units and a 7,500 square foot Day Treatment Center for the Office of Mental Retardation and Development Disabilities
|
Location: |
161 Woodruff Street, Brooklyn, N.Y.
|
Owner: |
Community Developers Inc.
Mr. Getz Obstfeld ((914) 235-7865) |
Cost: |
$3,300,000 |
Columbia Street Project Start 12/95 - 10/96
Owner/Developer - Gut Rehab of a five story building; first two stories to be renovated into a twelve bed intermediate care facility for mentally retarded/developmentally disabled individuals, remaining three floors will be made into 14 apartments.
|
Location: |
296-8 Columbia Street, Brooklyn, N.Y.
Columbia Street L.P.
60 Sackett St., Brooklyn, NY 11231
Mr. Matthew Lonuzzi (718) 834-0770 |
Owner: |
Cost: |
$3,300,000 |
NYS Motor Vehicle of Brooklyn Start 9/92 - 6/93
Owner/Developer - Responsible for the construction of a one story building encompassing 50,000 sq. ft. designed and built in accordance to tenant specification including 2 2 acres for a 400 vehicle parking facility.
|
Location: |
2875 West 8th Street, Brooklyn, NY
|
Owner/Developer: |
2875 West Eighth Street Associates
c/o Cheever Development Corp.
60 Sackett Street, Brooklyn, NY 11231
Mr. Matthew Lonuzzi (718) 834-0770 |
Development Cost: |
$6,500,000 |
Paul Robeson High School Start 8/92 - 4/97
Gut rehabilitation work including but not limited to, installation of a gymnasium, cafeteria, computer rooms, woodshop room, photography rooms, and laboratories.
|
Location: |
128 Albany Avenue
Brooklyn, NY 11213
|
Owners: |
N.Y.C. School Construction Authority
30-30 Thomson Ave., L.I.C., NY 11101
Mr. Fuad Motia, 718) 472-8145 |
Cost: |
$24,000,000 |
Citi Line Housing Start 11/91 - 3/93
Complete Gut Rehab of 66 residential units located in Brooklyn, New York.
|
Owners: |
New York City Housing Authority
123 William Street, New York, NY
Joe Nanartowich
(212) 306-4361 |
Cost: |
$2,319,000 |
Southern Boulevard Project Start 11/91 - 3/93
Complete gut rehabilitation of 44 residential units located in the Bronx, New York (HPD funded).
|
Owners: |
Dept. of Housing Preservation & Development
100 Gold Street, New York, NY
John Caldwell
(212) 806-8731 |
Cost: |
$1,974,000 |
Cypress Apartments Start 9/91 - 11/92
Complete gut rehab of twenty-seven (27) residential units located in Brooklyn, New York.
|
Owners: |
Cypress Hill Development Corp.
Michelle Neugenbauer
(718) 647-2800 |
Cost: |
$1,850,000 |
Bill Rainey Houses Start 8/90 - 10/91
Complete gut rehab of fifty-five (55) residential units located in the Bronx, New York.
|
Owners: |
Banana Kelly Associates
Getz Obstfeld
(212) 328-1064 |
Cost: |
$3,781,250 |
Nelson Avenue Rehabilitation Start 5/90 - 5/92
Complete gut rehabilitation of eighty-one (81) residential units in Bronx, NY also a one acre park area.
|
Owners: |
Dept. of Housing Preservation & Development
|
Construction Managers: |
New York City Housing Authority
Joe Nanartowich (212) 306-4361 |
Cost: |
$4,415,000 |
Riga Avenue Project Start 6/90 - 5/91
Construction of five (5) new two family homes located at 573-581 Riga Avenue, Staten Island, N.Y. composed of wood frame with brick veneer.
|
Owners: |
Riga Avenue Realty
Andrew Leider
(718) 522-6400 |
Tiffany Mews Start 6/89 - 3/91
General Contractor
Complete gut rehab for 134 Luxury apartment units located at 27-63 Tiffany Place Bklyn, N.Y.
|
Owners: |
Tiffany Mews Association
Andrew Leider
(718) 522-6400 |
Cost: |
$11,650,000 |
Ogden Avenue Rehabilitation Start 1988 - 10/90
Complete gut rehab of building (169 units) for the New York City Housing Authority located at 1360,1372,1376,1380,1386,1390 Ogden Ave., 1341,1345 Plimpton Ave, Bronx, N.Y.
|
Owners: |
New York City Housing Authority
Joe Nanartowich
(212) 306-4361 |
Cost: |
$8,319,200 |
Calvary Baptist Church Hsg. for the Elderly Start 3/90 - 7/91
New construction of a 6 story, 100 apartments building composed of block and plank, responsible for all aspect of general construction.
|
Architect: |
Grasso-Menziuso Associates, P.C. - Architects, A.I.A.
300 East 34th Street, New York, N.Y. 10016
Contact: Mr. Christopher T. Menziuso
(212) 779-0257
|
Cost: |
$8,100,000 |
College Point Project Start 10/88 - 11/89
Constructed twenty-seven (27) new three family homes located at 105th Street and Fifth Avenue, College Point, N.Y. composed of panelized light gauge steel framing system.
|
Owner/Developer: |
Bruno Frustaci Inc.
Emillio Locassio
(718) 567-0229 |
Cost: |
$5,180,000 |
182 Bay 22nd Street Start 1988 – 1989
General Construction of sixteen (16) Luxury Housing Units located at 182 Bay 22nd Street, Brooklyn, N.Y.
|
Owner: |
Palerna Realty
Nick Argano (718) 738-5536 |
Cost: |
$1,290,000 |
Clinton Mews Start 1987 - 1988
Complete gut rehab of seventy-eight (78) luxury apartment units located at 372 Dekalb Ave, Bklyn, N.Y.
|
Owners: |
Clinton Mews Association
Charles Hack - (212) 972-2310 |
Cost: |
$5,450,000 |
Delafield Estates Start 9/86 - 8/87
Constructed seventeen (17) new two family homes located at 246th Street and Riverdale Avenue, Bronx, N.Y. composed of wood frame with brick veneer.
|
Owner/Developer: |
Bruno Frustaci Inc.
Emillio Locassio (718) 567-0229 |
Cost: |
$3,200,000 |
One Tiffany Place Start 1985 - 1986
Developer & Contractor
Complete gut rehab of seventy (70) luxury apartment units located at 1 Tiffany Place, Brooklyn, N.Y.
|
Owners: |
1 Tiffany Place Assoc.
Andrew Leider - (718) 522-6400 |
Cost: |
$6,000,000 |
Cooper Square Project Start 11/85 - 11/86.
Construction of new cooperative building (36 units) located at 63-65 Cooper Square, New York, New York
|
Location: |
|
Owner/Developer: |
Gellar Development
Emillio Locassio
(718) 567-0229 |
Cost: |
$3,100,000 |
|